图书介绍
土木工程专业英语【2025|PDF|Epub|mobi|kindle电子书版本百度云盘下载】

- 宇德明主编 著
- 出版社: 长沙:中南大学出版社
- ISBN:9787548711933
- 出版时间:2014
- 标注页数:236页
- 文件大小:39MB
- 文件页数:249页
- 主题词:土木工程-英语
PDF下载
下载说明
土木工程专业英语PDF格式电子书版下载
下载的文件为RAR压缩包。需要使用解压软件进行解压得到PDF格式图书。建议使用BT下载工具Free Download Manager进行下载,简称FDM(免费,没有广告,支持多平台)。本站资源全部打包为BT种子。所以需要使用专业的BT下载软件进行下载。如BitComet qBittorrent uTorrent等BT下载工具。迅雷目前由于本站不是热门资源。不推荐使用!后期资源热门了。安装了迅雷也可以迅雷进行下载!
(文件页数 要大于 标注页数,上中下等多册电子书除外)
注意:本站所有压缩包均有解压码: 点击下载压缩包解压工具
图书目录
Chapter 1 Spread footings and driven pile foundations1
1.1 Spread footings1
1.2 Driven piles2
1.3 Factors to be considered in selecting piles5
Chapter 2 Flexible pavements8
2.1 Conventional flexible pavements8
2.2 Full-depth asphalt pavements10
2.3 Contained rock asphalt mats11
Chapter 3 The railway cross section14
3.1 Ballast14
3.2 Crossties or sleepers15
3.3 Rails16
3.4 Tie plates16
3.5 Fastenings17
3.6 Rail anchors17
3.7 Rail ioints17
Chapter 4 New Austrian tunneling method21
4.1 Introduction21
4.2 Historical aspects of NATM21
4.3 General concepts of NATM22
4.4 Scope of application of NATM24
4.5 Concluding remarks25
Chapter 5 The Analysis of Controlled Deformations(ADECO)and its advantages28
5.1 ADECO approach28
5.2 Advantages of the ADECO approach over sequential excavation and NATM31
5.3 Conelusions32
Chapter 6 Productive modeling for development of as-built BIM of existing indoor structures37
6.1 Introduction37
6.2 Conventional methods38
6.3 Proposed approach40
6.4 Experiments and results41
6.5 Conclusions47
Chapter 7 Technology development in construction:a continuum from distant past into the future52
7.1 Introduction52
7.2 Creativity and technology54
7.3 Historical retrospective56
7.4 Linking the present to the past57
7.5 Innovation environment in construction technology and possible way forward61
Chapter 8 Life cycle design and prefabrication in buildings:A review and case studies in Hong Kong67
8.1 Introduction67
8.2 Research methodology68
8.3 Results and discussion70
8.4 Conclusions79
Chapter 9 Construction assessment and long-term prediction of prestressed concrete bridges based on monitoring data85
9.1 Introduction85
9.2 Case study86
9.3 Finite element analysis90
9.4 Results and discussion96
9.5 Conclusions103
Chapter 10 Revised case-based reasoning model development based on multiple regression analysis for railroad bridge construction109
10.1 Introduction109
10.2 Current status of cost estimation for railroad-bridge construction in South Korea110
10.3 Case-based reasoning and genetic algorithm methodology111
10.4 Estimation of approximate construction cost using case-based reasoning113
10.5 Conclusion124
Chapter 11 Preparation of tender documents127
11.1 General127
11.2 Letter of invitation to tender127
11.3 Instructions to tenderers128
11.4 Conditions of contract132
11.5 Specifications132
11.6 Drawings133
11.7 Bill of quantities/schedule of prices133
11.8 List of additional information required from the tenderers133
Chapter 12 Evaluation of tenders and award of contract138
12.1 Review of tenders138
12.2 Tenders containing deviations138
12.3 Adjudication of tenders139
12.4 Rejection of all tenders140
12.5 Award of contract141
Chapter 13 Study of the relationship between procurement duration and project performance in Design-Build projects:comparison between water/wastewater and transportation sectors146
13.1 Introduction146
13.2 Background147
13.3 Research methodology149
13.4 Results151
13.5 Discussion of findings156
13.6 Conclusions163
Chapter 14 Design management in Design-Build megaprojects:SR 99 Bored Tunnel case study166
14.1 Introduction166
14.2 Research methodology167
14.3 Background168
14.4 Project design management177
14.5 Lesson learned to date and conclusions183
Chapter 15 Cost management on PFI projects188
15.1 Introduction188
15.2 Structure of BOT projects189
15.3 Case study:Nottingham Express Transit(NET)Light Rail189
15.4 Factors leading to success on BOT projects191
15.5 Risks and securities192
15.6 Case study:Sydney SuperDome,Australia193
15.7 The Private Finance Initiative(PFI)194
15.8 The role of the cost consultant in PFI/PPP projects199
15.9 Case study:Stoke-on-Trent Schools,UK200
15.10 Conclusion203
Chapter 16 Assessment of expressway construction using Quality Performance Index207
16.1 Introduction207
16.2 Quality assessment items207
16.3 Diagnosis of quality control level through analysis of QPI assessment results216
16.4 Conclusions221
三套模拟试卷224
参考文献236
热门推荐
- 3132619.html
- 2399951.html
- 3116206.html
- 519752.html
- 2767066.html
- 2615654.html
- 1984504.html
- 2012673.html
- 91966.html
- 1326064.html
- http://www.ickdjs.cc/book_3684379.html
- http://www.ickdjs.cc/book_235935.html
- http://www.ickdjs.cc/book_2277901.html
- http://www.ickdjs.cc/book_1068132.html
- http://www.ickdjs.cc/book_3680117.html
- http://www.ickdjs.cc/book_154114.html
- http://www.ickdjs.cc/book_1888073.html
- http://www.ickdjs.cc/book_2718950.html
- http://www.ickdjs.cc/book_3795643.html
- http://www.ickdjs.cc/book_2560932.html